1) Can a project certified under Green Mark 2021, but not yet verified, apply for recertification using the Green Mark In Operation criteria to maintain its Green Mark status?
2) What does "legacy project" refer to?
3) For a mixed development project with both Non-residential and Residential components, under which criteria should the GM assessment be conducted if each component's GFA is above 2000 sqm?
4) What criteria are considered in GM: 2021 for improving project impacts beyond Green Mark 2015?
5) Which aspect is a pre-requisite in GM: 2021?
7) Which of the following areas is emphasized under GM: 2021 with a higher standard?
8) Under GM: 2021, how is energy efficiency addressed compared to GM NRB: 2015 and GM ENRB: 2017?
9) During which phase is it recommended to measure the TSE for VRF systems through permanent M&V?
10) In which scenario is M&V required for existing buildings when assessing under GM: 2021 In Operation?
11) Under what condition is M&V mandatory for VRF systems in new developments according to GM: 2021?
12) In the GM: 2021 SLE EE Fixed Matrix, which areas are included as non-air-conditioned space?
14) For EE Pathway 1 and 3, what should be done if the actual operational hours differ from the standardized schedule during verification?
16) For retail buildings under GM: 2021 pathway 2, where must the lighting power budget (LPB) requirement be met?
17) For existing malls under GM: 2021 pathway 2, what must the landlord impose in addition to meeting the lighting power budget (LPB) requirements?
18) For an existing building targeting GM Platinum SLE under pathway 3, what should be used as a baseline for demonstrating 60% energy savings?
19) To meet the SLE requirement, how must the first 60% energy saving be achieved?
22) For projects not pursuing Green Mark or SLE certification under GM: 2021, what must they comply with?
23) Can an existing building with a lower GM rating, such as Certified or Gold, be upgraded under GM: 2021 In Operation?
24) For a project previously certified under GM ENRB ver3 applying for re-certification under GM: 2021 In Operation, how can air side efficiency be verified if permanent M&V was not previously required?
25) For a project previously certified Green Mark Platinum, can it be certified with badges under GM: 2021 In Operation during re-certification?
26) Under what circumstances must a project go through full certification under GM: 2021 instead of GM: 2021 In Operation for re-certification?
27) For an existing building coming in for re-certification under GM: 2021 full certification, on what should the EUI be based?
28) When calculating air conditioning saving and payback, what should be considered?
29) For a mixed development project where either the Non-residential or Residential GFA is less than 2000 sqm, which criteria should be used for GM assessment?
30) For a mixed development project where either the Non-residential or Residential GFA is less than 2000 sqm, and developers wish to target different GM ratings for each component, what should they do?